Nearly every bathroom we open in Happy Valley came from a builder’s package, not a previous generation’s renovation, so the wear we find is a different kind of problem. A shower pan whose factory seal finally gave out, or a toilet still sitting on the wax ring it shipped with twenty years ago, can send water into the subfloor long before anyone notices a soft spot. We trace that moisture back to its source first, because putting failed framing right again is work this crew handles start to finish, not a scope we pass along to someone else.
Licensed and insured. Oregon CCB #262707
On anything sent before 5pm
We match or beat most written estimates
Remodels completed
We strip the room to framing, wrap every wet wall in a sealed membrane, and set nothing but new fixtures when it goes back together.
The original builder-grade surround comes out, waterproofing goes in, and the new pan and glass only go in once that passes inspection.
A leak like this often means replacing framing and subfloor down to solid wood, something we see more once builder-grade materials hit the 15- to 25-year range.
We build every wet surface, floor, wall and shower pan alike, on top of one sealed membrane rather than trusting bare cement board to do that job alone.
Vanity and toilet go in level, lighting gets wired to code, and the fan is rated for a room this size, not a leftover builder unit.
Same room, same window. One side is the bathroom the owners lived with. The other is the one they have now.
Drag the handle. Left, the bathroom as we found it: a tub behind a curtain, a small vanity, shelves on the wall. Right, the same room finished: a glass shower, a soaking tub under the window, a wood vanity on a herringbone floor.
Before After A bathroom in one of these subdivisions does not give out at the surface tile. It gives out behind it: the membrane bonded under that tile, the slope built into the shower pan, the sealed corners, and a fan that is actually ducted to the outside rather than looping into the attic space above a vaulted ceiling. None of that shows up in a listing photo, and a rushed remodel skips every bit of it while still passing a final walkthrough. We build every wet area to current waterproofing standards and route every fan duct clear outdoors, because on a lot graded into a hillside cut between Mount Scott and Scouters Mountain, water that cannot escape through the vents finds the lowest point in the framing instead.
Three different builds can sit behind a shower’s tile, and which one your contractor used matters more than the tile pattern ever will. The system we install is a bonded membrane, sheet or liquid, carried across the backer board and tied into one unbroken skin at every corner, seam and pipe, with tile set over the top. A rigid foam panel reaches the same result a different way, since the panel itself is the waterproof layer. The builder-grade shortcut common in production homes from the 1990s and 2000s was plain cement board with a bead of mastic at the seams, a combination that tends to fail somewhere around the fifteen- to twenty-year mark, which lines up with exactly where a lot of Happy Valley bathrooms sit right now. We do not install that third option, because the layer it skips is the only thing standing between the shower and your subfloor.
Half of that waterproofing lives in the pan itself. A shower floor needs a steady slope toward the drain, and a curbless, step-free entry, which is what most people ask for in a refresh, has to start that slope below the level of the surrounding floor. In a house framed within the last two or three decades, that usually means working with engineered floor trusses or dimensional joists already set to a standard subdivision plan, so getting the drop right means either notching through that bay or building the rest of the floor up to match, a call made before any tile is ordered. That is why a flush entry adds real cost in a bathroom that has never been touched since the original builder finished it, and barely moves the number when the floor is being framed from scratch for an addition.
The tile itself mostly comes down to how much upkeep you want going forward. Large-format porcelain leaves very few grout lines to scrub and fewer joints that can eventually fail, though it needs a wall flat enough to take it and costs more in labor to set. A smaller mosaic on the shower floor grips better underfoot when wet but hands you back every one of those extra seams. Natural stone looks the part and drinks water just as readily, so putting marble in a shower signs you up for a resealing schedule you actually have to keep. Run epoxy grout anywhere water and a scrub brush meet, ordinary grout everywhere else, and a flexible sealant rather than grout at every inside corner, since a corner moves and grout parked in it only cracks.
Spend where the wall closes over it and save where you can always change your mind later. The mixing valve, pressure-balanced or thermostatic, disappears into the wall the moment tile goes up, so that is the piece worth buying well the first time rather than reopening finished work down the road. The handle and showerhead bolted to its face, on the other hand, swap out on any ordinary weekend. Floating a vanity off the wall opens up the smaller secondary bathrooms common to these subdivision floor plans, though the studs need solid blocking fastened in before drywall closes, a decision made early rather than late. Keep particleboard cabinetry away from a wet shower wall altogether, since standard developer-grade stock does not hold up long in a room this humid.
Last is the exhaust fan, the cheapest line on the whole estimate and the one piece deciding whether the room stays healthy. Size it to the square footage, carry its duct the entire way to open air rather than letting it dead-end above a dropped ceiling or inside an attic truss space, wire it to a timer or a humidity sensor, and insulate the run so condensation does not weep back into the housing. A fan original to a home built in the late 1990s was often undersized for today’s expectations even when new, and twenty-plus years of service have not helped it move any more air. A bathroom that cannot fully dry out between uses rots on a schedule no matter how new the house around it is, and that one inexpensive fan is the whole difference.
Here the finishes are already gone, hauled out down to the last tile and the last scrap of old flooring, and what is left is a wall of old plank sheathing, loose fiberglass batts hanging out of the stud bays, an old drain fitting standing open where the toilet used to sit, and the toilet itself parked in the corner, waiting since it is always the last fixture reset.
Look at the wall on the right and you are looking at new construction inside an existing room, not a patch job. A wall earns a full rebuild like that once a shower has been quietly feeding it water through daily use. The supply lines sit capped, and the shower valve is already anchored at the exact height it will hold for good, a call that cannot be put off, because the valve sets the entire tile layout and both disappear together the second the backer board goes up.
We treat this stage as the real consultation, because once the board goes up, nothing about the room’s layout can change without tearing it open again. Standing in the open framing, we work out the pan’s slope, confirm whether the entry will sit flush with the floor, pick the spot for a recessed niche, and decide if a water-softened joist gets sistered or swapped outright. That is also why we do this walkthrough in person rather than over a phone call: a photo after the fact cannot show you what the framing actually looked like, only what it became.
Happy Valley’s housing stock is barely a few decades old at the oldest, which surprises people into assuming there is nothing to find under the floor. There is. A shower that has run daily since a subdivision’s first owners moved in has had twenty, sometimes thirty years to push water past a wax ring or a shower pan seam nobody has thought to check. When demo turns that up, the difference is what happens next: we rebuild damaged framing ourselves as a core part of this trade, not a scope we hand off while your project sits waiting on someone else’s schedule.
The same handful of culprits shows up house after house across these subdivisions. Expect a spot of give in the floor right at the toilet, left by a factory wax seal that failed years into the home’s life with nobody the wiser. The joist under the shower drain has frequently gone dark and soft to the touch. A length of rim joist ends up weakened where an overflowing tub has crept into the wall cavity, something we see often on the graded, stepped lots built into the hillside cuts near Mount Scott. And framing along an exterior wall decays in any room where the original builder-grade fan never moved enough air to matter. We open the floor wide enough to catch all of it while it is still exposed, because a joist costs the least to fix right now, with everything visible, not after new drywall hides it again.
Most Happy Valley homeowners assume the fixtures are the expensive part of a bathroom remodel. They are not. Labor claims the largest share of the number by a wide margin, because a room of thirty-five to forty square feet still has to pass through plumbing, electrical, framing, waterproofing, tile setting, painting and finish carpentry, one trade at a time, and tile work in particular is slow, exacting and billed by the square foot regardless of how small the room is. Tile and membrane materials come second, scaled to the surface you actually cover rather than the floor plan, which is why carrying tile to the ceiling costs meaningfully more than stopping at shoulder height. Fixtures and the vanity are entirely your call, priced to whatever grade you choose. The plumbing rough-in comes last on the list and it is cheap when nothing relocates, expensive the moment a toilet or shower does.
What pushes an individual quote up or down follows a short list: whether anything in the layout moves, since a relocated toilet or shower means new drain runs cut into a subfloor that, on these sloped subdivision lots, often has to account for the grade the house was built on in the first place; how much of the room gets tiled; which tier of fixtures you land on; and what the floor turns out to be hiding once it is actually open. A straightforward refresh that leaves the layout alone sits near the bottom of the range. Reworking the floor plan and tiling to the ceiling sits at the top. Every estimate we send is itemized, and any hidden damage we find is priced as its own line you approve before we touch it. Already holding a written bid from someone else? We generally match or beat it by 10%.
One number on that page never shrinks no matter how we trim the rest, and it happens to be one of the smallest figures on the whole estimate: the membrane sealed behind the tile. Skipping it might hand you back a couple hundred dollars today, in exchange for a repair running into the thousands once the framing underneath has had a few more years to sit wet. We will not price a bathroom that way, and we would rather lose the bid than build a shower in one of these newer homes that is already destined to fail early.
10%
Send a few close-up shots, especially of any spot that flexes or shows discoloration, and note roughly how old the house is. Messages in before 5pm get a reply the same afternoon.
Expect the disturbance to stay penned into this one room rather than spreading through the house, since a space this size leaves nowhere for it to spread. What follows is the order the work actually runs in, flagged where it matters most for a household getting by on a single bathroom.
Before a single wall gets touched, the tile, the vanity and every fixture for the new room are already ordered and sitting in our shop, checked against the plan. Letting a demo crew tear a bathroom apart and then wait on a late tile shipment is the single most avoidable delay in this business. The other thing we settle early is logistics: exactly where the dust barrier goes up and the path the crew will use to move debris and materials through the rest of the house.
One day handles most of these, with a second only if the room runs larger than average. Out come the vanity, the tub, the tile and the old flooring, until nothing is left but the studs and subfloor the builder closed up twenty-some years ago, all of it visible in one pass.
With everything exposed, we check the framing, the subfloor and the original supply lines put in when the house was framed. Find anything damaged and you get photographs that same day, along with a price before another board gets cut.
New supply lines and circuits reach their fixture locations first, with solid blocking fastened into the studs ahead of time for the vanity and any grab bars. From there, the City of Happy Valley’s own Building Division inspects the rough-in, a permit tracked the whole way through the city’s HV Works portal rather than a county office, and nothing closes up until that sign-off is logged.
The sequence runs backer board, then a continuous membrane sealed tight across every corner and pipe penetration, then the shower pan, with tile only starting once all of that is cured and checked. Nothing about the tiling stretch can be compressed to fit a calendar. Thinset needs its own days to set before grout goes in, and grout needs more time still before anyone uses the room, a timeline that belongs to the materials, not to us.
The room gets its last pieces now: toilet and vanity reset, mirror and shower glass hung, the exhaust fan wired and tested, walls painted and trim carpentry finished. We walk through every item on the signed estimate with you before calling it done. Expect the toilet and sink to be back in daily use a few days ahead of the shower, which needs its own time for the tile work to fully cure.
The shower is the fixture out of service the longest, since it needs demolition, a new membrane, tile, and real curing time before anyone can step into it. The toilet and sink almost always return to service well before that point. Flag it as your only bathroom when we scope the job and we will build the schedule around getting those two back online as early as the sequence allows.
Yes, this is one of the most requested changes in Happy Valley’s subdivisions, where the tub typically has not moved since the first owner closed on the house. The work means relocating the drain, waterproofing the whole wet area properly, and in nearly every case running new tile up the walls. Taking the tub out also exposes the floor underneath it, and that is frequently where a factory wax seal gave out years ago and left a quietly softened patch of subfloor nobody had reason to suspect.
In a house this age, give at the base of the toilet almost always traces back to the original wax ring finally failing, letting water into the subfloor on every flush since. It is a routine repair once the floor is open, and it only gets more expensive the longer it sits, since the leak does not stop on its own. Send us a photo of the spot and we can usually judge how far it has traveled before we ever pull a board.
If the plan moves plumbing, opens up wiring, or rebuilds structural framing under the floor, then yes, and that permit is filed and tracked through the City of Happy Valley’s own Building Division using the city’s HV Works portal, not through Clackamas County. Our Oregon contractor license, CCB #262707, lets us handle that filing and stand for every inspection it calls for. Leave the fixtures exactly where they already sit and skip anything structural, and in most cases no permit is required at all.
Usually, yes, and the cost turns on how the floor was framed when the subdivision went in. A step-free base has to start lower than the surrounding floor, so with standard joists or engineered floor trusses already in place, that means either notching down through that bay or building the rest of the floor up to meet it. Which approach fits depends on what we find, and on a lot graded into a hillside cut, the crawlspace underneath usually tells us before we cut anything open.
Tile is not what stops water. The layer underneath it is. We build backer board first, bond a continuous waterproof membrane over it with every corner, seam and pipe penetration sealed, and only set thinset and tile once that skin is fully cured. Skip the membrane and rely on backer board alone, and you have built a surface that soaks through exactly like drywall would, just slower. That shortcut is the single most common thing we find when we open up a Happy Valley bathroom that was built on a developer’s original punch list.
Yes, even though the house itself is not old. A builder-grade fan sized to code minimums in the late 1990s or 2000s was never generous to begin with, and two or three decades of service have not made it move any more air. Undersized, or ducted into an attic truss space instead of outdoors, it leaves the room wet for hours after every shower, and that lingering moisture is exactly what rots framing and grows mold behind a vanity. Sizing it correctly, routing the duct fully outside, and wiring it to a timer or humidity sensor costs very little while the walls are already open.
Nobody finishes a full gut and rebuild in under two weeks, and most run closer to a month once you count inspection and cure days rather than just labor days. A rough-in inspection alone can add several days to the calendar waiting for the city’s schedule to open up, and that is before thinset gets its required cure time ahead of grout, which then needs its own days before anyone can safely use the room. Finding soft framing once the floor is open adds more. What we send you upfront is a real day count tied to your specific scope, not a generic range, and if the house only has the one bathroom, that schedule is built around returning the sink and toilet to service long before the shower is ready.
The drive to Happy Valley crosses the Columbia at the I-205 bridge, then continues the length of the Portland metro before the road climbs into the bowl between Mount Scott and Scouters Mountain where the city actually sits, which makes this one of our longer drives rather than one of our shorter ones. Our Oregon contractor license is CCB #262707, and the bathrooms we take on here run from the established streets of Rock Creek and Southgate, to the subdivisions still filling in around Pleasant Valley and Jackson Hills, up into the Mount Hood view lots around Ridgecrest, and out to the graded hillside streets of West Mount Scott.
Three of the 50 reviews on our Google profile, in the homeowners' own words.
David's work was terrific. Repaired a rotted out structural framing issue in a bathroom and replaced (and resized!) a window in the same space. He initially quoted a two day job but was able to finish in a single day. Dedicated! Will be using him again.
Joe H.Bathroom framing repair
Evergreen crew installed three skylights for us. Once we opened the ceiling there was more to do than expected and they handled it without drama. Clean work, fair price, and they cleaned up after themselves.
Foad M.Three skylights
David the owner came by for a quote and was able to get us scheduled right away. The communication was great with his team and the guys were on time and very professional. Would highly recommend.
Scott G.Kitchen nook bench
Send photos and a short description. If it arrives before 5pm you get an answer the same day.
Already have a written estimate from someone else? Send that too. We match or beat most estimates by 10%.
Built for the wet side of the river.
Licensed and insured remodeling contractor serving Vancouver, WA and the Portland metro.
Oregon CCB #262707 · WA Lic. #EVERGRS757MCEvergreen Renewal Services LLC
505 SE 184th Ave Unit 320
Vancouver, WA 98683
© 2026 Evergreen Remodeling. Oregon CCB #262707 · WA Lic. #EVERGRS757MC. Evergreen Renewal Services LLC. All rights reserved.
Same day response on anything sent before 5pm.